Project: N18TA   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:DeWitt Whittington   -  
Project:   Glasair - Sportsman 2+2   -   VIEW REPORTS
Total Hours:3544.2
Start/Last Date:Nov 22, 2003 - Sep 30, 2021
Engine:Lycoming O-360-A1A 180hp
Propeller:Hartzell Constant Speed 72"
Panel:GRT HX (3), GTN650, GTR200, VP200, Trio Pro Pilot,
 
Friendly URL: https://eaabuilderslog.org?s=N18TA

Home or Last Project Picture

Jul 11, 2004     Horizontal stabilizer front support bracket installation - (20 hours)       Category: Horiz Stab
The large aluminum machined bracket with two pressed in swivel balls preinstalled supports the front of the horizontal stabilizer. It mounts against Bulkhead C. We cut a rectangular hole in the bottom skin of the stabilizer which allowed the two guide pins inside the horizontal stabilizer to engage for accurate alignment. We used the centerline of the fuselage, which we had previously carefully marked, to gauge where to position the bracket and a digital level to make sure the bracket was level.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.